Puxico Wastewater Collection and Treatment Project
Smith&Co. provided upgrades to the wastewater treatment plant with the addition of LEMNA baffles & lagoon covers, and UV disinfection. This 1.1M dollar project in Stoddard County also added 6 inch PVC forcemain and video inspection and slip lining of selected sewer lines. Funding was accomplished thru USDA CDBG grant sourcing. The City video inspected…
Read MorePoplar Bluff Wastewater Treatment Plant Improvements
Smith&Co. completed a Facility Plan, preliminary engineering report, final design and inspection for the lagoon treatment upgrades for the 10 million gallon per day (MGD) wastewater treatment plant for the City of Poplar Bluff. The project upgraded the City’s existing facilities and included new muffin monster grinders, manual bar screen, new blowers, aeration headers, diffusers,…
Read MoreHubble Fjord Bridge Replacement
Smith&Co. provided engineering services to replace the iconic low water crossing in the City of Jackson’s City Park complex. The design included addressing channel hydraulics, providing multi-use access, electrical components, park aesthetics, and community sentiment.
Read MorePoplar Bluff Water Tower
Smith & Company Engineers provided final design and inspection services of a 1.5 million gallon elevated storage tank in Poplar Bluff, Missouri. The new tank is approximately 133 feet tall and 86 feet in diameter and sits on a foundation of 224 Geopiers. The tank is located with Bacon Park and connects in with the…
Read MoreNew Madrid Water Treatment
Smith & Company Engineers provided the preliminary engineering, final design, and inspection services of a 2.0 million gallon per day water treatment plant and a 750,000 gallon elevated storage tank in New Madrid, Missouri.
Read MoreSmoke Testing For Poplar Bluff
Smith & Company Engineers provided staff and equipment to perform location mapping and smoke testing for the entire Poplar Bluff Sanitary Sewer System over a 4 year period that began in 2009. Results from the smoke testing was tabulated into reports to identify inflow and infiltration areas and approximate costs to correct the issues. All…
Read MorePoplar Bluff Oak Grove Road
The Oak Grove Road project improved the existing two-lane Oak Grove Road to a five-lane roadway, while coordinating with MoDOT’s new Oak Grove Road and Highway 67 Interchange project. It also included two new signalized intersections at Shelby Road and the newly constructed Poplar Bluff Regional Medical Center Entrance. Phase I was completed in 2012…
Read MoreEight Points Development
As a partner with K2 Commercial Group, Smith & Company has helped prepare plans for the Eight Points Development at the Intersection of U.S. 60 and U.S. 67 in Poplar Bluff, Missouri. Included in the plan is work at the new Poplar Bluff Regional Medical Center (PBRMC) and Oak Grove Road improvements.
Read MoreButler County Industrial Park Bypass
Butler County Industrial Park Bypass Project located in Poplar Bluff, Missouri created a heavy duty transportation route from Cravens road to the US 67/ Route M intersection. Approximately two miles of roadway was built by improving an existing gravel county road and building new roadway sections. This new road reduces the truck traffic that must…
Read More